This system was installed at the Coyotes Plant in Aguascalientes, Mexico for the ARCA group—the second largest bottler in Latin America. We provide the best quality for the best soft drink in the industry. The Coca Cola Arca Aguascalientes Project was the first central Split Flow system and water is supplied to each of its processes: water, refreshment and services.
Split Flow technology allows for a recovery of 95% of the water (reflected in the cost per cubic meter produced in each of its different processes), which is the lowest compared to any other alternative technology for these applications. This project included a multi-barrier water treatment system that meets all the requirements of the RFWA135 / BPRQ-180 standard, control of water quality parameters at the outlet of the filtration system (pH, conductivity, turbidity, chlorine), control and force system for all the equipment listed above, assembly of interconnection heads, commissioning and adjustments.
This system was installed at the Coyotes Plant in Aguascalientes, Mexico for the ARCA group—the second largest bottler in Latin America. We provide the best quality for the best soft drink in the industry. The Coca Cola Arca Aguascalientes Project was the first central Split Flow system and water is supplied to each of its processes: water, refreshment and services.
For all process requirements for bottled and process water, American Water Solutions has the best option according to the technology that represents the lowest operating costs, with the safest processes for operators and for the final product, speaking in terms of quality, microbiology and flow.